Contractor Invoice Math & Overcharge Checker
Catch mistyped labor hours, inflated line extensions, and tax calculation mistakes on plumbing, HVAC, and repair bills before cutting the check. Includes a 1099-NEC review flag and a polite correction note.
1-Click Sample Ready: Loads a commercial plumbing repair bill with a hidden +$200.00 overcharge on Line 3 (14 hrs × $165.00 billed as $2,510.00).
What BillTally Checks Automatically
Labor hours × hourly rate check
Catches arithmetic slips on after-hours labor, trip fees, and materials line items.
Short-pay vs. billed export toggle
Choose whether your Excel or QuickBooks CSV records the verified true math total or the original paper figure.
1099-NEC service review flag
Highlights service-based contractor bills so you remember to collect a W-9 before year-end.
Polite supplier dispute packet
Generates a calm, line-by-line correction note with a shareable Verified Audit Link.
Frequently Asked Questions
How do I share an overcharge finding with my contractor?
Click 'Copy Verified Dispute Link' on the workbench to get a clean, read-only math breakdown page you can paste into an email.
Can I export the corrected total to Excel?
Yes. Toggle 'Use Verified Math Total' and download a 3-tab Excel workbook with live =SUM() formulas.